Meet initially at Fire Road 28 entrance @ 9 0'clock (on road from Tunstall village towards Orford :B1078). This is the current entrance point for the harvesting contractors. From there we will need to condense transport methods as there's only room for about 4 cars at the work site lay by on the road. I'll take my trailer with the tools and a few bods straight to the work site off-road. If you have enough ground clearance and traction you should be OK to follow the track beside the power lines but there is a steep rooty off-camber climb involved.

The work will be on the two berms and down slope at the end of V3. The berms have been partly eroded away so need rebuilding and realigning to make them flow better.

The down slope has washed into a gully as it runs straight down the fall-line. This needs altering to provide rain water run off to the sides and slight realignment for a better entry line to the two berms at the bottom.

The diversion route has been already been cleared and will just need sign posting on the day.

Image

Image

Probably finish about 12 or earlier for those who want to ride as well. Please bring suitable hefty footwear, safety boots if you have them, drink and some grub. If this is your first TB session with TROG, can you please fill-in the attached forms and give them to me on the day.
Attachment:
Agreement for services doc.pdf [75.69 KiB]
Downloaded 5 times

Attachment:
PDF volunteer details).pdf [11.2 KiB]
Downloaded 4 times


Please also read the Risk Assessment and Method Statement.
Attachment:
2015Full RA and MS.pdf [968.83 KiB]
Downloaded 4 times


I will get the tools, safety gear, gloves etc from the container beforehand, but I would appreciate it if folks could post here if they are coming so I can get the right amount of gear.

Thanks,
John

_________________
TRAIL BUILDING COORDINATOR
Image
There is no WiFi in the forest but I promise you a better connection.


Top
 Profile  
Reply with quote  
PostPosted: Wed Jan 03, 2018 4:00 pm 
Offline
TROG Member
User avatar

Joined: Wed Nov 28, 2007 10:19 am
Posts: 4234
Location: Beccles
This is the same berm built 5 years ago on 6th Jan 2013.

Image

_________________
TRAIL BUILDING COORDINATOR
Image
There is no WiFi in the forest but I promise you a better connection.


Top
 Profile  
Reply with quote  
PostPosted: Thu Jan 04, 2018 5:36 pm 
Offline
TROG Member
User avatar

Joined: Sat Sep 26, 2015 8:50 am
Posts: 19
Location: Saxmundham
I’m planning on coming - I’ll get the forms printed out & filled in as I’m a trail building noob.


Sent from my iPhone using Tapatalk


Top
 Profile  
Reply with quote  
PostPosted: Sat Jan 06, 2018 11:04 am 
Offline
TROG Member

Joined: Sun Apr 19, 2009 8:57 pm
Posts: 905
I'll be there :D
I'm going to head over early for a spin before the fun begins.


Top
 Profile  
Reply with quote  
PostPosted: Sat Jan 06, 2018 1:54 pm 
Offline
TROG Member
User avatar

Joined: Wed Nov 28, 2007 10:19 am
Posts: 4234
Location: Beccles
Human wrote:
I'll be there :D
I'm going to head over early for a spin before the fun begins.


Can you have a look around Section V8 to see if there's any trail damage? I've got a feeling they've started extracting timber to FR24 which means crossing the trail somewhere.

_________________
TRAIL BUILDING COORDINATOR
Image
There is no WiFi in the forest but I promise you a better connection.


Top
 Profile  
Reply with quote  
PostPosted: Sat Jan 06, 2018 5:25 pm 
Offline
TROG Member

Joined: Sun Dec 06, 2015 9:24 am
Posts: 7
Location: Carlton Colville
Another newbie planning on coming tomorrow. Will try print the forms off


Top
 Profile  
Reply with quote  
PostPosted: Sat Jan 06, 2018 8:17 pm 
Offline
TROG Member
User avatar

Joined: Sat Sep 26, 2015 8:50 am
Posts: 19
Location: Saxmundham
I think I'll probably bike over from Sax so I'll catch up with you at V3


Top
 Profile  
Reply with quote  
PostPosted: Sun Jan 07, 2018 4:21 pm 
Offline
TROG Member
User avatar

Joined: Wed Nov 28, 2007 10:19 am
Posts: 4234
Location: Beccles
Thanks for your work this morning chaps, sorry it went on a bit longer than planned but we achieved everything I wanted to get done :clap: . Two berms replaced and two side discharge drains with rollers installed on the long down-slope.

Image

Image

Image

Image

_________________
TRAIL BUILDING COORDINATOR
Image
There is no WiFi in the forest but I promise you a better connection.


Top
 Profile  
Reply with quote  
PostPosted: Sun Jan 07, 2018 7:02 pm 
Offline
TROG Member
User avatar

Joined: Mon Sep 17, 2012 8:12 pm
Posts: 263
Location: Carlton Colville
Great work everyone, top stuff, sorry I couldn’t make this one, family stuff got priority unfortunately


Sent from my iPhone using Tapatalk

_________________
Life is like riding a bicycle - in order to keep your balance, you must keep moving. ~Albert Einstein


Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 9 posts ] 

All times are UTC


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group
abr_misc_09_2_t.jpg
mikel_misc_04.jpg
misc_1_t.jpg
greedy_wales10_2_t.jpg
You are here: Home TROG Forum TROG Forum Trailbuilding Sunday 7th trail repair session.